STACK INFRASTRUCTURE

Facilities

STACK Infrastructure TKY01A

Tokyo, Kanto

TKY01A has 18MW of critical capacity of both READYSTACK and POWERSTACK. The facility is designed to enable higher rack density and floor loading specifications, reflecting the evolving requirements in Inzai and APAC.

STACK Infrastructure TKY01B

Tokyo, Kanto

TKY01 is a two-building data center campus by STACK Infrastructure located in Inzai, one of Tokyo's fastest-growing hyperscale hubs. Spanning 6 acres, the site provides up to 36 megawatts of critical IT capacity, with each facility backed by regional power from Tokyo Electric Power Company.

STACK Infrastructure TKY01 Campus

Tokyo, Kanto

STACK Infrastructure TKY01 Campus is a 36MW, two-building hyperscale data center campus in Inzai, Tokyo, Japan, powered by Tokyo Electric Power Company.

STACK Infrastructure KIX01 Campus

Osaka, Kansai

Please see the profile for further details about STACK Infrastructure KIX01.

STACK Infrastructure KIX01A

Osaka, Kansai

This facility is part of a larger 72MW campus designed to support hyperscale and enterprise customers. The first phase will provide 18MW of IT capacity and is expected to be operational by the second quarter of 2027.

STACK Infrastructure KIX01C

Osaka, Kansai

KIX01 is STACK Infrastructure's data center campus located in Keihanna, an eastern suburb of Osaka, Japan. The campus spans 13 acres and will consist of three purpose-built buildings delivering a total of 72 megawatts of critical IT capacity.

STACK Infrastructure KIX01B

Osaka, Kansai

KIX01 is STACK Infrastructure's data center campus located in Keihanna, an eastern suburb of Osaka, Japan. The campus spans 13 acres and will consist of three purpose-built buildings delivering a total of 72 megawatts of critical IT capacity.